Utility Dive19d agobearish
PJM drops Oklo advanced nuclear project from interconnection study cycleOklo asked the Federal Energy Regulatory Commission to order the PJM Interconnection to reinstate its 750-MW, mixed-technology project. PJM reportedly told Oklo that it never showed the project could ride through a sudden drop in grid voltage.